IDENTIFIKASI WASTE DENGAN VALSAT DAN PEMBUATAN JADWAL MAINTENANCE UNTUK MENINGKATKAN OEE PADA IKM KOMPONEN OTOMOTIF
DOI:
https://doi.org/10.30871/jatra.v7i2.10985Keywords:
Lean Manufacturing, WAQ, WRM,, QFM, Maintenance MachineAbstract
This research aims to identify and minimize waste in the join maple production process at PT MNO, an IKM (small and medium industry) company operating in the automotive component sector. A lean manufacturing approach was applied using Value Stream Mapping (VSM) to analyze the overall production flow. Furthermore, a Waste Assessment Questionnaire (WAQ) followed by a Waste Relationship Matrix (WRM) was used to determine the most dominant type of waste. The results indicate that defect waste is the main problem, leading to increased production time due to additional rework activities. Three types of defects were identified in join maple products, namely burnt defects, small head dimensions, and burr defects. The VALSAT approach using Quality Filter Mapping (QFM) revealed that burr defects were the most dominant, occurring in the cutting process at a rate of 1.26%, exceeding the company standard of 1%. Based on fishbone diagram analysis, the main causes of burr defects include corrective maintenance practices, the absence of a periodic tool replacement schedule, and weak implementation of the 5S/5R culture. The proposed improvements include daily tool inspections as preventive maintenance, the use of inspection check sheets, scheduled tool replacement, and the application of jidoka. The results show that the defect rate decreased from 1.26% to 0.88%, availability increased from 88% to 94%, performance efficiency rose from 63.76% to 80%, and quality improved from 98.73% to 99.34%, resulting in a 19.55% increase in Overall Equipment Effectiveness (OEE).
Downloads
References
[1] A. Suseno And H. Hengky, “Identifikasi Dan Eliminasi Pemborosan Aktivitas Pada Proses Produksi Suku Cadang Dengan Pendekatan Lean Manufacturing,” Jiems (Journal Of Industrial Engineering And Management Systems), Vol. 12, No. 2, Aug. 2019, Doi: 10.30813/Jiems.V12i2.1667.
[2] I. Y. Rangkuti Et Al., “Rancangan Alat Bantu Pada Proses Produksi Baut/Mur Dengan Menggunakan Metode Value Stream Mapping (Vsm) Di Pt Ila,” Jenius : Jurnal Terapan Teknik Industri, Vol. 5, No. 2, Pp. 302–312, Nov. 2024, Doi: 10.37373/Jenius.V5i2.1404.
[3] P. Moengin And N. Ayunda, “Lean Manufacturing Untuk Meminimasi Lead Time Dan Waste Agar Tercapainya Target Produksi (Studi Kasus: Pt. Rollflex Manufacturing Indonesia),” 2020.
[4] H. Hamdi Azwir And A. Kurniawan Setyanto, “Analisis Penerapan Lean Manufacturing Pada Penurunan Cacat Feed Roll Menggunakan Metode Pdca (Studi Kasus Pt. Xyz).”
[5] Sarnadi And N. Sulistyowati, “The Effect Of Lean Manufacturing And Physical Work Environment On Labor Productivity In The Apparel Industry In Indonesia: Case Study,” International Journal Of Research In Business And Social Science (2147- 4478), Vol. 13, No. 1, Pp. 146–156, Feb. 2024, Doi: 10.20525/Ijrbs.V13i1.3131.
[6] S. Gianluca Fenta Et Al., “Pendekatan Fmea Untuk Mengidentifikasi Penyebab Kerusakan Mesin Bubut (Studi Kasus: Laboratorium Manufaktur Politeknik Negeri Batam),” 2025. [Online]. Available: Http://Jurnal.Polibatam.Ac.Id/Index.Php/Jatra,Https://Jurnal.Polibatam.Ac.Id/Index.Php/Jatra
[7] B. Haddli Irawan Et Al., “Pengaruh Weld Time Terhadap Kecacatan Produk Pada Proses Pengelasan Material Termoplastik Abs (Akrilonitril Butadiena Stiren) Menggunakan Mesin Ultrasonic Welding,” 2020. [Online]. Available: Http://Jurnal.Polibatam.Ac.Id/Index.Php/Jatra,Https://Jurnal.Polibatam.Ac.Id/Index.Php/Jatra
[8] M. Mandhalena Manurung Et Al., “Study Keausan Mata Pahat Pada Proses Pembubutan Material St 37,” 2024. [Online]. Available: Http://Jurnal.Polibatam.Ac.Id/Index.Php/Jatra,Https://Jurnal.Polibatam.Ac.Id/Index.Php/Jatra
[9] F. Sumasto Et Al., “Pdca Method Application To Mitigate No Hole Drilling Defects In Housing Large Rcl Products In The Automotive Sector,” Engineering Journal, Vol. 29, No. 10, Doi: 10.4186/Ej.2025.29.10.55.
[10] H. Widiastuti, S. E. Surbakti, F. Restu, M. Hasan Albana, And I. Saputra, “Identifikasi Cacat Produk Dan Kerusakan Mold Pada Proses Plastic Injection Molding,” 2019. [Online]. Available: Http://Jurnal.Polibatam.Ac.Id/Index.Php/Jatra,Https://Jurnal.Polibatam.Ac.Id/Index.Php/Jatra
[11] T. Aria Auliandri And N. Chofiya Alfiani, “Lean Manufacturing Approach To Reduce Wastefulness During Production Of Train Car-Body Using Valsat Method,” Kne Social Sciences, Vol. 3, No. 10, Nov. 2018, Doi: 10.18502/Kss.V3i10.3467.
[12] A. Khunaifi, R. Primadasa, S. B. Sutono, And F. Teknik, “Implementasi Lean Manufacturing Untuk Meminimasi Pemborosan (Waste) Menggunakan Metode Value Stream Mapping Di Pt. Pura Barutama,” Jurnal Rekayasa Industri (Jri), Vol. 4, No. 2, 2022.
[13] S. Suhaeri, M. M. Mayanti, And Z. F. I. Ikatrinasari, “Implementation Of Lean Manufacturing With Vsm Method For Increase Testingprocess Efficiency Laboratory Drug Antacid,” Jurnal Teknik Industri, Vol. 14, No. 2, Pp. 117–129, Sep. 2024, Doi: 10.25105/Jti.V14i2.18899.
[14] A. M. Zulfikar And T. Rachman, “Penerapan Value Stream Mapping Dan Process Activity Mapping Untuk Identifikasi Dan Minimasi 7 Waste Pada Proses Produksi Sepatu X Di Pt,” 2020.
[15] M. Azka Al, T. Industri Otomotif, And P. Stmi Jakarta Jl Letjend Suprapto, “Minimasi Lead Time Proses Produksi Pada Part Otomotif Tipe Bz 460 Rh Menggunakan Value Stream Mapping (Vsm) Di Pt Xyz,” 2025.
[16] R. Brilianto And N. P. Waluyowati, “Analisis Proses Produksi Dengan Value Stream Mapping Pada Industri Manufaktur,” Jurnal Kewirausahaan Dan Inovasi, Vol. 3, No. 4, Pp. 1095–1103, Nov. 2024, Doi: 10.21776/Jki.2024.03.4.14.
[17] A. J. Pical, Y. Irawati, And D. Andrian, “Lean Manufacturing Analysis: Using Wam And Valsat To Reduce Waste In The Plastic Sack Finishing Process At Pt Surya Plastindo,” 2025. [Online]. Available: Www.Scientific.Net.
[18] I. A. Rawabdeh, “A Model For The Assessment Of Waste In Job Shop Environments,” International Journal Of Operations And Production Management, Vol. 25, No. 8, Pp. 800–822, 2005, Doi: 10.1108/01443570510608619.
[19] A. Setiawan Et Al., “Studi Kasus Analisis Defect Pada Komponen Otomotif Disertai Pemecahan Masalah Menggunakan Diagram Pareto Dan Fishbone,” Jurnal Ilmiah Research Student, Vol. 2, No. 2, Pp. 53–63, 2025, Doi: 10.61722/Jirs.V2i2.4748.
[20] M. R. Gunarti Et Al., “Analisis Dampak Tersumbatnya Sistem Pelumasan Pada Mesin Diesel Generator Tipe Weichai Di Mv. Tasik Mas Dengan Metode Fishbone Diagram”.
[21] F. Sumasto Et Al., “Implementasi Penjadwalan Preventive Maintenance Untuk Meningkatkan Nilai Efektivitas Mesin Pada Mesin Cnc Milling Vl-10i.”
[22] H. Tenis, A. Siburian, And B. H. Irawan, “Perencanaan Penjadwalan Preventive Dan Proactive Maintenance Pada Dies Molding Capacitor,” 2020. [Online]. Available: Http://Jurnal.Polibatam.Ac.Id/Index.Php/Jatra,Https://Jurnal.Polibatam.Ac.Id/Index.Php/Jatra
[23] R. Sahabuddin And A. Karim, Pengantar Statistika. 2021. [Online]. Available: Https://Www.Researchgate.Net/Publication/354740344
[24] B. Budiharjo And Z. F. Ikatrinasari, “Upaya Perbaikan Keandalan Roller Mill Dengan Root Cause Analysis Dan Pendekatan Preventive Maintenance,” Jurnal Teknik Industri, Vol. 6, No. 3, Nov. 2016, Doi: 10.25105/Jti.V6i3.1544.
[25] F. Imansuri, Y. Hermawan, F. Sumasto, I. Rizki Pratama, F. Gusti Dendra, And I. Agustiningsih Imdam, “Implementation Of Min-Max Stock Insert Components To Prevent Lost Opportunity Tooling Case Study: Automotive Component Company,” Ijiem (Indonesian Journal Of Industrial Engineering & Management), Vol. 6, No. 2, Pp. 240–250, 2025, Doi: 10.22441/Ijiem.V6i2.26678.
Downloads
Published
How to Cite
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.



11.jpg)