Assessment of Cross-Section Interval Variations for Earthwork Volume Estimation on Straight and Curved Road Alignments
DOI:
https://doi.org/10.30871/jagi.v10i1.13204Keywords:
Cross-section interval, earthwork volume, road geometry, cut and fill, volume accuracy, Average End AreaAbstract
Cross-sectional interval variations on cut and fill volume estimation for straight and curved road alignments. Unlike previous studies that focused on a single road geometry, this study compares straight and curved road sections under identical survey conditions. Data were collected using an Electronic Total Station with cross-sectional intervals of 10 m, 25 m, and 50 m, representing dense, moderate, and sparse survey sampling scenarios commonly applied in road construction projects. Earthwork volumes were calculated using the Average End Area method based on SWDTM, Microsoft Excel, and AutoCAD Civil 3D. A paired sample t-test was applied to evaluate the significance of volume differences among interval scenarios. The results show that larger cross-sectional intervals produced greater discrepancies in cut and fill volume calculations. On straight road sections, estimated fill volumes ranged from 237.050 m³ to 254.250 m³, while on curved road sections they ranged from 333.100 m³ to 360.250 m³. Statistical analysis indicated that all calculated t-values were lower than the critical t-value at the 95% confidence level, suggesting that interval variations did not produce statistically significant differences in calculated volumes. However, wider intervals generated larger practical discrepancies and relative errors. These findings indicate that a 25 m cross-sectional interval provides a practical balance between survey efficiency and earthwork volume estimation reliability for road construction projects.
Downloads
References
AASHTO. (2018). A Policy on Geometric Design of Highways and Streets (7th ed.). Washington, DC: American Association of State Highway and Transportation Officials.
Adi, S. (2017). Analisis Perhitungan Volume Galian dan Timbunan Menggunakan Metode Average End Area pada Pekerjaan Jalan. Jurnal Teknik Sipil, 6(2), 45–53.
Azzumardi, M., Putra, A., & Rahman, F. (2022). Pengaruh Variasi Interval Penampang Melintang terhadap Ketelitian Perhitungan Volume Cut and Fill pada Pekerjaan Jalan. Jurnal Geodesi dan Geomatika, 18(1), 15–24.
Balqis, N., Saputra, D., & Nugroho, A. (2023). Evaluasi Jarak Penampang Melintang terhadap Ketelitian Perhitungan Volume Pekerjaan Tanah Menggunakan Data Survei Topografi. Jurnal Rekayasa Infrastruktur, 9(2), 88–97.
Basuki, S. (2011). Ilmu Ukur Tanah. Yogyakarta: Gadjah Mada University Press.
Firmansyah, R., Hidayat, T., & Prasetyo, D. (2022). Comparative Analysis of Earthwork Volume Calculation Methods Using Paired Sample T-Test. International Journal of Civil Engineering and Technology, 13(4), 112–121.
Firmansyah, R., Hidayat, T., & Prasetyo, D. (2023). Evaluation of Average End Area and Prismoidal Methods for Earthwork Volume Estimation. Journal of Construction Engineering, 15(1), 22–31.
Fisu, A. A., Hamka, H., Iskandar, M., & Arifin, A. (2020). Transportation Infrastructure Development and Regional Economic Growth. IOP Conference Series: Materials Science and Engineering, 875, 012089.
Ghilani, C. D., & Wolf, P. R. (2017). Elementary Surveying: An Introduction to Geomatics (15th ed.). New York: Pearson.
Hofmann-Wellenhof, B., Lichtenegger, H., & Wasle, E. (2008). GNSS – Global Navigation Satellite Systems: GPS, GLONASS, Galileo, and More. Vienna: Springer.
Leick, A., Rapoport, L., & Tatarnikov, D. (2015). GPS Satellite Surveying (4th ed.). Hoboken, NJ: John Wiley & Sons.
Montgomery, D. C., & Runger, G. C. (2014). Applied Statistics and Probability for Engineers (6th ed.). Hoboken, NJ: John Wiley & Sons.
Purwati, E. (2020). Analisis Ketelitian Perhitungan Volume Galian dan Timbunan Menggunakan Metode Average End Area pada Pekerjaan Jalan. Jurnal Teknik Infrastruktur, 5(1), 34–42.
Putra, R. A. (2022). Pengaruh Kerapatan Penampang Melintang terhadap Akurasi Perhitungan Volume Tanah pada Proyek Jalan. Jurnal Geomatika Indonesia, 11(2), 65–73.
Rahayu, S. (2015). Metode Pengukuran Detail Situasi dengan Total Station pada Survei Topografi. Bandung: ITB Press.
Walpole, R. E., Myers, R. H., Myers, S. L., & Ye, K. (2012). Probability and Statistics for Engineers and Scientists (9th ed.). Boston: Pearson.
Wati, D. (2023). Evaluasi Akurasi Perhitungan Volume Pekerjaan Tanah pada Proyek Infrastruktur Jalan. Jurnal Teknik Sipil dan Lingkungan, 8(1), 21–30.
Wolf, P. R., & Ghilani, C. D. (2012). Elementary Surveying: An Introduction to Geomatics (13th ed.). New Jersey: Pearson Education.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Journal of Applied Geospatial Information

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Copyright @2023. This is an open-access article distributed under the terms of the Creative Commons Attribution-ShareAlike 4.0 International License which permits unrestricted use, distribution, and reproduction in any medium. Copyrights of all materials published in JAGI are freely available without charge to users or / institution. Users are allowed to read, download, copy, distribute, search, or link to full-text articles in this journal without asking by giving appropriate credit, provide a link to the license, and indicate if changes were made. All of the remix, transform, or build upon the material must distribute the contributions under the same license as the original.