Irwan, M. I., Ratlalan, R. M. and Adrian, D. (2026) “ANALISIS KEANDALAN BUCKET ELEVATOR MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) UNTUK MENURUNKAN DOWNTIME PRODUKSI DI PT XYZ: ANALISIS KEANDALAN BUCKET ELEVATOR MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) UNTUK MENURUNKAN DOWNTIME PRODUKSI DI PT XYZ”, Jurnal Teknologi Dan Riset Terapan (JATRA), 8(1), pp. 45–53. doi: 10.30871/jatra.v8i1.12311.