IRWAN, Muhammad Irwan; RATLALAN, Roberth M; ADRIAN, Dimas. ANALISIS KEANDALAN BUCKET ELEVATOR MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) UNTUK MENURUNKAN DOWNTIME PRODUKSI DI PT XYZ: ANALISIS KEANDALAN BUCKET ELEVATOR MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) UNTUK MENURUNKAN DOWNTIME PRODUKSI DI PT XYZ. Jurnal Teknologi Dan Riset Terapan (JATRA), [S. l.], v. 8, n. 1, p. 45–53, 2026. DOI: 10.30871/jatra.v8i1.12311. Disponível em: https://jurnal.polibatam.ac.id/index.php/JATRA/article/view/12311. Acesso em: 14 sep. 2026.