Irwan, M. I., Ratlalan, R. M., & Adrian, D. (2026). ANALISIS KEANDALAN BUCKET ELEVATOR MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) UNTUK MENURUNKAN DOWNTIME PRODUKSI DI PT XYZ: ANALISIS KEANDALAN BUCKET ELEVATOR MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) UNTUK MENURUNKAN DOWNTIME PRODUKSI DI PT XYZ. Jurnal Teknologi Dan Riset Terapan (JATRA), 8(1), 45–53. https://doi.org/10.30871/jatra.v8i1.12311