Oka, J. and Kartikasari, D. (2019) “EVALUASI MANAJEMEN WAKTU PROYEK MENGGUNAKAN METODE PERT DAN CPM PADA PENGERJAAN ‘PROYEK REPARASI CRANE LAMPSON’ DI PT MCDERMOTT INDONESIA”, Journal of Applied Business Administration, 1(1), pp. 28–36. doi: 10.30871/jaba.v1i1.1257.