WAHYUNI, Elvi; HENDRAWAN, Bambang. ANALISIS KINERJA PROYEK "Y"MENGGUNAKAN METODE EARNED VALUE MANAGEMENT (Studi Kasus di PT Asian Sealand Engineering). Journal of Applied Business Administration, [S. l.], v. 2, n. 1, p. 60–78, 2018. DOI: 10.30871/jaba.v2i1.784. Disponível em: https://jurnal.polibatam.ac.id/index.php/JABA/article/view/784. Acesso em: 23 feb. 2025.