(1)
Wahyuni, E.; Hendrawan, B. ANALISIS KINERJA PROYEK "Y"MENGGUNAKAN METODE EARNED VALUE MANAGEMENT (Studi Kasus Di PT Asian Sealand Engineering). JABA 2018, 2, 60-78.