[1]
Wahyuni, E. and Hendrawan, B. 2018. ANALISIS KINERJA PROYEK “Y”MENGGUNAKAN METODE EARNED VALUE MANAGEMENT (Studi Kasus di PT Asian Sealand Engineering). Journal of Applied Business Administration. 2, 1 (Mar. 2018), 60-78. DOI:https://doi.org/10.30871/jaba.v2i1.784.